FONCICYT Project: Ruhrpumpen Mexico

3D design of a pump
FONCICYT Project

Development and construction of 43 middle-part double-entry FV-pumps for water production.

Tasks of Hal-Engineering: Calculation and validation of the pump housing with FEM Design, selection and validation of the pump components Fatigue strength analysis for rotor stacks.

November 2009